Estimate the gross USD value of a copper ore or concentrate lot from grade, tonnage and payable %. The full calculator adds treatment & refining charges, transport, FX conversion and a branded PDF report.
Example: 1,000 t of ore at 2.5 % Cu, 96 % payable, LME copper at $9,200/t → 1,000 × 0.025 × 0.96 × 9,200 = $220,800 gross. Smelter TC/RC, transport and FX still get deducted before the final payment.
Gross value = tonnes × grade % × (payable %) × LME copper price (USD/t). The full MetalPulse calculator then subtracts treatment & refining charges (TC/RC), transport, smelter penalties and applies FX before showing a net payable figure.
Smelters typically pay 96–98 % of contained copper for clean concentrate (≥ 25 % Cu). Lower-grade or impure concentrate gets a lower payable plus deductions. MetalPulse defaults to 96 % which is the standard published in most smelter term sheets.
Yes. The preview on this page is free and requires no login. Saving lots, exporting a branded PDF report and using the multi-metal calculator require a MetalPulse subscription.
LME Copper cash settlement in USD per tonne, sourced from our live feed. Every result shows the exact price, source, market type and timestamp used in the calculation — never a bare number.