Estimate the gross USD value of a copper ore or concentrate lot from grade, tonnage and payable %. The full calculator adds treatment & refining charges, transport, FX conversion and a branded PDF report.
Example: 1,000 t of ore at 2.5 % Cu, 96 % payable, LME copper at $9,200/t → 1,000 × 0.025 × 0.96 × 9,200 = $220,800 gross. Smelter TC/RC, transport and FX still get deducted before the final payment.
Gross value = tonnes × grade % × (payable %) × LME copper price (USD/t). The full MetalPulse calculator then subtracts treatment & refining charges (TC/RC), transport, smelter penalties and applies FX before showing a net payable figure.
Smelters typically pay 96–98 % of contained copper for clean concentrate (≥ 25 % Cu). Lower-grade or impure concentrate gets a lower payable plus deductions. MetalPulse defaults to 96 % which is the standard published in most smelter term sheets.
The quick preview on this page is free and requires no login, but it is a simplified estimator only. The full MetalPulse calculator — saving lots, exporting a branded PDF report and using the multi-metal workflow — is a paid feature and requires an active MetalPulse subscription.
LME Copper cash settlement in USD per tonne, sourced from our live feed. Every result shows the exact price, source, market type and timestamp used in the calculation — never a bare number.